Login
Login
Determining contractor selection criteria based in project types and project objectives: a case study in Bangkok
Not available
Not available
2003
Thailand
(eng) English
Not available
Tugas Akhir S2/ Thesis
Not available
Not available
Not available
vii, 86 p.
30 cm.
ill.
Not available
Access no. Call number Location Status
02641/04 (T2) 690.068 Gin D Not available Available
02642/04 (T2) 690.068 Gin D Library - 8th Floor Available
Similar collections by subject
Close
Download QR code