Login
Login
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Not available
Not available
2002
Thailand
(eng) English
Not available
Tugas Akhir
Not available
Not available
Not available
vi, 107 p.
30 cm.
ill.
Not available
Access no. Call number Location Status
01294/03 (T2) 690.068 Ben I Not available Available
01295/03 (T2) 690.068 Ben I Not available Available
Similar collections by subject
Close
Download QR code