LKP : sistem pengaman transformator daya 30 MVA 150/20 kV 50 Hz di GIS (Gas Insulated Substation) Waru PT PLN (Persero) Transmisi Surabaya Selatan
Siagian, Janter
Unknown
Unknown (Surabaya, 1998)
(ind) Indonesian
Unknown
Laporan kerja praktek elektris
Unknown
ELECTRIC TRANSFORMERS;
Unknown
Unknown
Physical dimension
xi, 50 p.
29 cm
ill.
Summary / review / table of contents
No summary / review / table of content available
Copies
| Access no. |
Call number |
Location |
Status |
| 03062/98 |
L 621.3 Sia L/E-II |
Library - 6th Floor |
Available |