Studi teknis pengoperasian PLTU dengan bahan bakar ampas tebu untuk mengatasi beban puncak di Pg. Tjandi (2000 KW, 6000 V, 241 A, 80 % lagging)
Siaoman, Reno
Unknown
Unknown (Surabaya, 1994)
(ind) Indonesian
Unknown
Tugas Akhir No. 94/E/TST/021/0126
Unknown
ELECTRIC POWER SYSTEMS-LOAD DISPATCHING;
Unknown
Unknown
Physical dimension
xii, 139 p.
29
ill.
Summary / review / table of contents
No summary / review / table of content available
Copies
| Access no. |
Call number |
Location |
Status |
| 03582/94 |
(T) 621.31 Sia S |
Library - 8th Floor |
Available |