Production line relocation with design for six sigma approach at PT. Schneider Electric Manufacturing Batam

Now, SCHNEIDER ELECTRIC MANUFACTURING BATAM
(SEMB) needed to increase their production capacity with adding a new building.
This final assignment contents the using of IDOV (Identify, Design, Optimize,
and Verify) methodologies from DFSS (Design for Six Sigma) at SMB project
relocation. The objective using IDOV, help accomplish the project requirement
from customer (PEL, and VSD department) on the relocation phase during
implementation. Scheduling and qualify mover company are key of this project.
Relocation starts on 26th March, 2007.until early April 2007.
The using of this methodologies is enough simple, by input the lead-time
each production line and tracking the schedule base on actual condition during
implementation. Microsoft Project with Gantt chart helps to arrange the steps and
relation each production line. The final is evaluating the actual condition against
the design phase and see the problem factor during relocation with DOE (Design
of Experiment).as study case.

TEGUH KURNIAWAN I Gede Agus Widyadana (Advisor 1); Herri Christian Palit (Examination Committee 1) Universitas Kristen Petra English Digital Theses Undergraduate Thesis Skripsi/Undergraduate Thesis Skripsi No. 02041216/IND/2007; Teguh Kurniawan (25403074) EXPERIMENTAL DESIGN; SIX SIGMA (QUALITY CONTROL STANDARD); QUALITY CONTROL

Files