Simple search Advanced search Browse by DDC#

Tata cara penentuan lokasi dan pembangunan pos klimatologi

Indonesia. Departemen Pekerjaan Umum Unknown Departemen Pekerjaan Umum (Jakarta, [1995]) (ind) Indonesian Unknown Bahan konstruksi bangunan dan rekayasa sipil Unknown DAMS-DESIGN AND CONSTRUCTION-STANDARDS; Appendix: p. 12 - 30; Box 5/65; Unknown

Physical dimension
v, 30 p. 30 cm. ill.

Summary / review / table of contents

No summary / review / table of content available


Copies
Access no. Call number Location Status
04035/11 (R) 627.8 Ind T Library - 6th Floor/Standar PU Available