Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Cara pendekatan perhitungan kuantitas pembesian pada kolom struktur beton bertulang
Christiando A, David
Additional author
Erwin E., Daniel
Publisher
Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra
Year of publication
2017
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Skripsi
Edition
Not available
Subject
CONSTRUCTION INDUSTRY-MANAGEMENT
Note
Appendix: p. 50-62
Abstract
Not available
Number of pages
xiii, 62 p.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
02801/17
((T)) SIP 2179
Library - 8th Floor
Available
Similar collections by subject
Public private partnerships: De-mining gold field, makalah seminar, Surabaya 10 Mei 2006
Ogunlana, Stephen O.
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Koesharto, Sutikno
Konstruksi: industri, pengelolaan dan rekayasa
Abduh, Muhamad
Managing construction equipment
Nunnally, S. W.
Prosiding konferensi nasional teknik sipil I (KONTEKS I) tantangan industri konstruksi di masa depan
Siswadi
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Boediono, Fransiska Dwi Yuniati
Manajemen konstruksi
Djojowirono, Soegeng
Sustainable living: the role of whole life costs and values
Mithraratne, Nalanie
The Breeden realty office building construction schedule
Alifen, Ratna S
Workers participation in safety management system in construction projects in Thailand: a thesis
Gahari, Alvin Agustinus
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".