Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Jonathan, Vincent
Additional author
Sugiarto, Adrian Kristian
Publisher
Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra
Year of publication
2017
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Skripsi
Edition
Not available
Subject
CONSTRUCTION INDUSTRY-MANAGEMENT
Note
Appendix: p. 47-83
Abstract
Not available
Number of pages
xvi, 83 p.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
02683/17
((T)) SIP 2187
Library - 8th Floor
Available
Similar collections by subject
Workers participation in safety management system in construction projects in Thailand: a thesis
Gahari, Alvin Agustinus
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Sutrisno, Agus
Studi aspek material konstruksi pada tahap perencanan dan pelaksanaan konstruksi
Citra, Ferdy
A survey of progress characteristics of construction projects in Thailand and Indonesia
Nugraha, Paulus
Analisa perhitungan/kalkulasi pemakaian peralatan & mesin lainnya.
Contractor's management handbook
O'Brien, James J.
Decision and risk analysis for construction management
Lifson, Melvin W.
Project management checklists: a complete guide for exterior and interior construction
Stitt, Fred. A.
CPM in construction management
O'Brien, James J.
A Decision Support for the Long Range Planning in Construction: a thesis proposal
Barcia, Ricardo Miranda
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".