Simple search Advanced search Browse by DDC#

Construction scheduling with primavera project planner

Feigenbaum, Leslie Unknown Unknown (Upper Saddle River, N.J., 2002) (eng) English 0130922013 Unknown 2nd ed PRODUCTION SCHEDULING; Unknown Unknown

Physical dimension
xii, 340 p. 28 cm. ill.

Summary / review / table of contents

No summary / review / table of content available


Copies
Access no. Call number Location Status
00146/04 Res 690.068 Fee C Library - 8th Floor Available