Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Optimasi multi-objektif permasalahan time-cost-quality trade-off pada proyek soho X dengan menggunakan metode metaheuristik
Ho, Michael
Additional author
Gozal, Renaldy
Publisher
Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra
Year of publication
2018
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Skripsi
Edition
Not available
Subject
PROJECT MANAGEMENT
Note
Appendix: p. 46-97
Abstract
Not available
Number of pages
xiv, 97 p.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
02943/18
((T)) SIP 2239
Library - 8th Floor
Available
Similar collections by subject
Manajemen proyek: empat langkah menuju keberhasilan
Haynes, Marion E.
Studi kelayakan proyek: konsep teknik dan penyusunan laporan laporan
Husnan, Suad
Studi kelayakan proyek: teori dan praktek
Sutojo, Siswanto
Manajemen proyek: dari konseptual sampai operasional
Soeharto, Iman
Project management: A systems approach to planning, scheduling, and controlling
Kerzner, Harold
The team handbook: how to use teams to improve quality
Scholtes, Peter R.
The management of projects
Morris, Peter W.G.
Penerapan quality function deployment dalam bidang konstruksi
Tendean, Ivan
Manajemen proyek: berikut Keppres 29/30, tahun 1984
Lock, Dennis
Studi kelayakan Galaxi Mall ditinjau dari aspek pasar dan keuangan
Sanjata, Ronald Wibawa
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".