Model optimisasi utnuk penjadwalan ulang perjalanan kereta api

This paper discusses the train rescheduling problem due to disturbances. The train
rescheduling problem discussed in this paper is taken from a real train network of DAOP II
Bandung in Jawa, Indonesia. The train network consists of block sections including unidirectional
double-tracks and bidirectional single-tracks. There are some connections among trains
because they use same rolling stocks. A mixed integer linear programming model is formulated
to represent the problem. Main decision variables of the model are new departure and arrival
times due to the disturbance. The objective function to be minimized is the total weighted delay.
The model is examined using a hypothetical instance for four disturbance cases. Numerical
experiments show that the model can represent the problem under study

SUPRAYOGI; HERY RAMDHANI Unknown Universitas Kristen Petra Indonesian eDIMENSI Journal Unknown Jurnal Teknik Industri, Vol. 17, No. 2, Desember 2015, 97-104; SUPRAYOGI (NA00404224) dan HERY (NA00404771) Unknown

Files