Back to Search Page
Resource Detail

Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia [permalink]

Share/Save/Bookmark

Schneider Electric Indonesia Ltd .is implementing Lean Sigma concept
as it?s production system for continuous improvement. With these concept, PT.
SEI wants to satisty customer with a good quality product, on time delivery, and
has an efficient line production to increase the profit. Right now Low Voltage
(LV) line production has an extreme variation due to the variation in customer?s
demand for Blokset panel. It makes the line leader difficult to estimate the number
of operator in each workstation. The author is focusing in busbar and power
connection assy only due to the time limitation. The goal of this final project is to
calculate the appropriate number of operator for busbar and cable power
connection assy and finally it will improve LV line productivity.

Author
• (25403083) HENDRA PERMANA

Contributor
• (96-007) I Gede Agus Widyadana
• (NA00000518) HERU SYUHIRUL ALIM
• (02-031) Herri Christian Palit
• (NA00000441) BAMBANG HERMANTO

Publisher
Universitas Kristen Petra

Year : 2007

Subject
1. MANUFACTURING PROCESS
2. PRODUCTION MANAGEMENT

Keyword
lean manufacturing, red green analysis

Category
s1 - Skripsi/Undergraduate Thesis (Program Studi Teknik Industri S1)

Language
English

Rights
Skripsi No. 01041220/IND/2007; Hendra Permana (25403083)
The resource(s) is/are owned by the Creator/Contributor.Reproduction & distribution for non-commercial purposes is permitted provided that the credit for the Creator/Contributor and the source are explicitly stated,and no alteration are made

FILE(s)

1. jiunkpe-ns-s1-2007-25403083-10121-busbar-cover.pdf (4.01 MB) - [permalink]

2. jiunkpe-ns-s1-2007-25403083-10121-busbar-abstract_toc.pdf (146.26 kB) - [permalink]

3. jiunkpe-ns-s1-2007-25403083-10121-busbar-chapter1.pdf (237.38 kB) - [permalink]

4. jiunkpe-ns-s1-2007-25403083-10121-busbar-chapter2.pdf (284.29 kB) - [permalink]

5. jiunkpe-ns-s1-2007-25403083-10121-busbar-chapter3.pdf (166.31 kB) - [permalink]

6. jiunkpe-ns-s1-2007-25403083-10121-busbar-chapter4.pdf (156.93 kB) - [permalink]

7. jiunkpe-ns-s1-2007-25403083-10121-busbar-chapter5.pdf (297.74 kB) - [permalink]

8. jiunkpe-ns-s1-2007-25403083-10121-busbar-conclusion.pdf (167.47 kB) - [permalink]

9. jiunkpe-ns-s1-2007-25403083-10121-busbar-references.pdf (235.35 kB) - [permalink]

10. jiunkpe-ns-s1-2007-25403083-10121-busbar-appendices.pdf (818.2 kB) - [permalink]

 

Petra Christian University Library | library@petra.ac.id